Foster Creek |
Phase 1C Expansion: Plant site preparation included clearing, grubbing, grading, compaction, matting and construction of a run-off pond. |
Christina Lake |
Blow Down Pond Completion: scope of work included re-compaction, installation of leak detection pipes, cathodic liner and geocells for erosion purposes. |
Foster Creek |
Tank Farm Construction: scope of work included subgrade excavation, construction of a concrete retaining wall, compacting, back-fill, liner and leak detection system installation and containment rings for five tanks. |
Cold Lake |
General contractor for site preparation of 31 home lots and multi-family lot. Scope of work included site grading, underground services, and road and sidewalk construction. |
Foster Creek |
Installation of self-contained fire suppression system. Scope included construction of pump house foundation, pipe installation and excavation of 35,000 tons of material for FRP underground holding tanks. |
Bruderheim & Ashmont |
Trenching, back-fill and compacting for underground electrical services. |
Foster Creek |
Infrastructure Projects including foundation excavation for main office building, grading and subgrade for warehouse building, final grade of pipeline road crossing, ice road construction and foundation excavation, back-fill and compaction. Also supplied aggregates and on-site trucking of equipment around the site. |
Narrows Lake |
Excavation and installation of fire water suppression system for plant site. Scope included the use of HDPE pipe for the force main fire suppression system and excavation and installation of sewer water lines. |
Foster Creek |
Ongoing site support including material handling, equipment and material transport, fueling, flagging, snow removal, dust control, dewatering, etc. |
Articulating Rock Trucks |
Gravel & Sand Trucks |
Brown's has a huge 29,000 sq. ft. service shop that services and inspects all equipment in house.